[Vol. 07, No. 01] [January 2021]
- Citation
- Abstract
- Reference
- PDF Download
Paper Title | :: | BIM - NZEBuilding: Application of the BIM methodology for the construction of a school after the earthquake |
Author Name | :: | Dr. Eng. M. Ciccone || Dr. Eng. M. Lucarelli |
Country | :: | Mexico |
Page Number | :: | 01-02 |
The aim pursued in the development of the case study design is to create a school center with "almost zero energy" (nZEB) through the use of methodology (BIM from 3D to 6D) which, on the one hand, reduce the risk of errors in the design phase and, on the other hand, prevent subsequent time and cost extensions in the construction phase and allow for a detailed and updated energy analysis. This last point is essential for both the design phase and the facility management phase.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------